Hi Y'all !
It's officially 37 days since my last blog post, that's quite a bit better than the 6 month period! Ripper and I had a fantastic weekend. We have been thinking a lot about what we need done for the garage to go up, and we've decided to outsource a few activites.
- I have organised a guy to come in and render the front and tops of the front wall next week - then it will be DONE
- I'm getting quotes on the front gate, even though we'll probably do it ourselves
- I'm getting quotes on a guy coming in to do the side fence
I don't know if I've shared this, but we've got a hardifence down one side of the property, where the front 10 metres slopes down. Apart from that bit being in poor condition, it is also too low and my beautiful puppy would probably jump it as soon as he sees a juicy bird on the other side. However, the neighbours don't want to change it, so we are going to have to pay for it ourselves, and perhaps even just build our own if they don't give me the go ahead to rip it out... So there's a dude quoting that up right now. I've asked for 2 different quotes - 1) same hardifence material for about 10 metres and 2) colourbond from the front right back to the colourbond fence that goes between the house and the boundary. Ripper hates this idea - he says that it will look weird having a boundary fence half colourbond and half hardifence - but I like it, there is the side fence (house-boundary) that will separate the two types of fence and you won't be able to notice - the front yard will be colourbond, the backyard hardifence. Simples.
The other thing hip-happening is we are getting aircon in the office! Hoorah! Because I get SUPER UBER MEGA HOT during the day time, my brain stops working, and I cannot function. So, back to this weekend. We planned to do two things - lay a concrete slab for the new aircon compressor, and get the water meter ready for watercorporation (stab stab) to lower it and make it so we can drive over it. I'll come back to Saturday in a second, but today, Sunday, we have been busy beavers. First I got up and took Dozer to the dog park where we watched a cute corgi/collie nail himself on a pole while running with Doz, then Dozer got in a fight with a massive fluffy malamute named Odin. Most of the time Dozi was hanging out in a hole. He's totally normal.
While that was happening, Rip was vacuuming, and when I got home we got to work outdoors. I sorted the water meter by digging it out, despite the ants nest I found, and then requested watercorporation to lower it.
Ripper laid this sweet sweet concrete pad for the aircon compressor. I am hopeful this will be installed sometime next week.
Saturday! Saturday we went to have a looksee at "cash city", which was closed, Bunnings, and then Ross's Discount store. Rip was outside with the truck running when I pulled him back inside after discovering a bloody GEM. 5 minutes later and here is our new bath:
This puppy is 1700mm long, and we aren't sure if it will fit in our bathroom. Lucky we are smashing walls out, we may need to redesign! This bath is super comfortable as it comes up quite high, and me and Rip were able to fit it right into the storage unit (Thanks Felber's :) ). And... IT WAS ONLY SIX HUNDRED DOLLARS. THAT'S AMAZING. END.







