The blog can't keep up with the progress around here :)
Here is the front fence (which was commented on by the side fencer the other day, he said it "came up good". I'll take that). You'll also notice we have a sweet letter box. And look at that paved water meter still going strong!
Here is the concrete pad. I realised this morning we forgot to put a pit in it. Ripper promptly told me pits are illegal in residential areas. Pfffftttt. You may also notice that there are 3 loads of washing on the line. That's because, in my infinite wisdom, I "fixed" the washing machine. Slash, when I turned it off overnight and back on the next day it was fixed. I've done loads of loads (hahaha) since then (all on cold) and it hasn't skipped a beat - I'm still going to switch it out with the one in storage, but ugh too much work.
Here is the side fence (at the front of the property). I can't remember what I've told ya'll, but here's the long story. Our local council, City of Swan, uses the Dividing Fences Act 1961 definition of
the highlighted portion below (and no other details like height or anything):
A ‘sufficient fence’ is:
• a fence prescribed by a local government law; or
• a fence of any standard agreed upon by adjoining owners
provided that it does not fall below the standard prescribed by the relevant
local government law.
Where no local law or no agreement is made, a sufficient
fence is:
• a
substantial fence that is ordinarily capable of resisting the trespass of
cattle and sheep; or
• a fence determined by a Magistrates Court to be a
sufficient fence.
Now, I reckon that sheepies and mooies could easily knock over/jump/step over the piddly little fence we had at the front side of the property - it was hardifence and about 800mm high or less (with holes in it). But the landlords that own the property next door, they reckon it is sufficient. And I think, if they think it is sufficient, what's to say the magistrate's court won't think it's sufficient too? So it's not worth arguing about, we should just replace whatever portion of the fence entirely at our cost.
Enter Clamps and Ripper and the design process. Front fence is a big blue rendered wall with slats. North fence is mustard colorbond. Back fence is hardifence, to be replaced at some point with pale colorbond. South fence is hardifence... do we replace the front ~13m with colorbond or with hardifence?? Eventually I gave in to Rip and we asked a contractor to replace those front ~13m with hardifence the same height as the rest of the fence. When he started, he removes the piddly little fence section and then he knocks on the door. Guess what? The trees (1 of ours, 2 of theirs) have grown their roots all through the stupid hardifence, and if we want to replace it with hardifence we have to get a digger in, and it will kill half of our tree, and likely take their 2 trees out as well. What's more, for any alternative, we have to have uneven sections to make sure the poles going into the ground miss the majority of the tree roots.
HAHAHAHAHAHA I WIN WE HAVE TO HAVE COLORBOND!
So fence is done. When I asked how tall it was, he said "1.8m. Actually it is just over 1.8". I then asked how tall is the existing hardifence? "That will be 1.8m".... So I say "How come they are different heights?" He says "Well it depends how far they have put it into the ground". Hmmmm... Seems a bit dodgy to me. The join looks pretty rubbish - as Rip warned me. We are going to plant a tree over it and I've promised Rip we will review it once the house is done - it will be really easy to continue the colorbond on, but I just don't want the expense if I can avoid it. But yes Ripper, yes, we can review this once the house is done ;)
The other thing that is annoying is under the fence. Apparently you have to have a gap there for sand/dirt, but you can fill it with a plinth (which is what is on our other side fence). It doesn't help that the neighbours land is slightly higher than ours. I am not sure what I want to do with that space, maybe just raise the lawn? (haha "lawn"). Rip desperately wants to concrete and then tile that area under there - woah, slow down buddy, let's finish the house alright??!!
Lastly - I just want to add that me and Rip make a blimin' good team.